
City of Shreveport
Sanitary Sewer Rehabilitation Consent Decree & Water Flow Project
-Sewer line Repair, End of Line Installation, Service Lateral Reconnect
-Testing the water flow of the city of Shreveport, through opening fire hydrants with special pitot gauge equipment to measure pressure released throughout the city.
Sanitary Sewer Rehabilitation Consent Decree & Water Flow Project
-Sewer line Repair, End of Line Installation, Service Lateral Reconnect
-Testing the water flow of the city of Shreveport, through opening fire hydrants with special pitot gauge equipment to measure pressure released throughout the city.

Benteler Steel (Walbridge Construction)
Installation of:
4 exterior modular buildings,
12 interior office/breakroom buildings,
32 Bollards (custom fabrication)
Installation of:
4 exterior modular buildings,
12 interior office/breakroom buildings,
32 Bollards (custom fabrication)

Wing Zone Franchise
Complete Interior Remodel
Tape/Float/Texture/Paint All walls
Install wainscoting and chair rail
Install new vinyl plank flooring
Complete Interior Remodel
Tape/Float/Texture/Paint All walls
Install wainscoting and chair rail
Install new vinyl plank flooring

Caddo Correctional Center (CCC) Jail
112 Window replacement
-Install polycarbonate glass (3/8") and new glazing gaskets
-Apply DTM paint to all metal surfaces
112 Window replacement
-Install polycarbonate glass (3/8") and new glazing gaskets
-Apply DTM paint to all metal surfaces

Kansas City Southern Railroad (KCS)
Storeroom Interior Remodel
Drywall repair, Interior Texturing and Painting, Vinyl Base Cove replacing
Storeroom Interior Remodel
Drywall repair, Interior Texturing and Painting, Vinyl Base Cove replacing

Southern Oaks Apartments
Full Exterior Remodel
60 days
Siding/Fascia/Soffit repair, Painting
Concrete Removal and Finish
Metal Carport removal
Full Exterior Remodel
60 days
Siding/Fascia/Soffit repair, Painting
Concrete Removal and Finish
Metal Carport removal

Clarion Hotel
Parking Lot repair
Parking Lot repair

Wyndham Hotel
Hallway and Bathroom Remodeling
Demo drywall and install new 5/8" Fire Rated sheetrock
Painting
Bathroom Ceramic Tile Installation
Flooring
Hallway and Bathroom Remodeling
Demo drywall and install new 5/8" Fire Rated sheetrock
Painting
Bathroom Ceramic Tile Installation
Flooring

David Raines Community Centers
Interior/Exterior Remodeling
30 Days
Interior/Exterior Remodeling
30 Days

Eddie Jones / Chimp Haven
Garage Door Install
15 days
Demolish metal structure sides and install 3 new garage openings (10' high x 12' wide)
Garage Door Install
15 days
Demolish metal structure sides and install 3 new garage openings (10' high x 12' wide)

Fannie Mae/Freddie Mac/HUD
Board up, Clean Out, Demolition
Board up, Clean Out, Demolition

Overton Brooks VA Hospital
Deep Cleaning
Stairwell Metal Polishing
Deep Cleaning
Stairwell Metal Polishing